Trelleborg
Trelleborg Enables Amsterdam Yacht Building
Internationally renowned shipyard, Royal Van Lent, set out to upgrade its existing facilities at the Port of Amsterdam in order to enable the build of increasingly larger luxury super yachts of up to 160 meters in length. As part of the upgrade, Trelleborg’s marine and infrastructure operation has supplied one of its Gina gasket (G150-125) to the facility’s new floating dry dock.Built by de Kok Staalbouw in Heerle – Wouw, The Netherlands, the floating dry dock door was equipped with one of Trelleborg’s Gina gasket to prevent leakage…
Monitoring System Takes Guesswork Out of Mooring Mega Vessels
Mooring of large vessels in the LNG, petrochemical and container sectors is an intricate and critical procedure. The process entails bringing together a moving object with a static object, and with the imminent advent of even larger vessels (liquefied natural gas tankers with a capacity of 200,000 cubic meters and container ships with a capacity of 22,000 TEU*), the forces involved are enormous. For tankers and bulk carriers, mooring frequently takes place alongside jetties at the end of finger piers…